L- and H-Tile Transceiver PHY User Guide

ID 683621
Date 10/05/2023
Public
Document Table of Contents
Give Feedback

8.2. Transceiver Debugging Flow Walkthrough

This section describes the high-level steps of debugging L- and H-tile transceivers using the transceiver toolkit.

  1. Enabling Transceiver Toolkit Support.
  2. Programming the design into an Intel FPGA.
  3. Loading the design to the transceiver toolkit.
  4. Creating transceiver links.
  5. Running link tests.