Intel® Quartus® Prime Standard Edition User Guide: Design Compilation

ID 683283
Date 9/24/2018
Public
Document Table of Contents

3.6.2. Project Navigator

The Hierarchy tab of the Project Navigator provides a view of the project hierarchy and a summary of resource and device information about the current project. After Analysis & Synthesis, before the Fitter begins, the Project Navigator provides a summary of utilization based on synthesis data, before Fitter optimizations have occurred.

If an entity in the Hierarchy tab contains parameter settings, a tooltip displays the settings when you hold the pointer over the entity.