System Specification
Device Selection
Early System and Board Planning
Pin Connection Considerations for Board Design
I/O and Clock Planning
Design Entry
Design Implementation, Analysis, Optimization, and Verification
Design Checklist
Appendix: Cyclone® 10 GX Transceiver Design Guidelines
Conclusion
Document Revision History
Document Revision History
| Date | Version | Changes |
|---|---|---|
| November, 2017 | 2017.11.06 | Made the following changes:
|
| May, 2017 | 2017.05.31 | Initial Release |