Visible to Intel only — GUID: mwh1409958317398
Ixiasoft
2.1. Compilation Overview
2.2. Using the Compilation Dashboard
2.3. Design Netlist Infrastructure
2.4. Using the Node Finder
2.5. Analysis & Elaboration Flow
2.6. Design Synthesis
2.7. Design Place and Route
2.8. Incremental Optimization Flow
2.9. Fast Forward Compilation Flow
2.10. Full Compilation Flow
2.11. Compilation Monitoring Mode
2.12. Exporting Compilation Results
2.13. Integrating Other EDA Tools
2.14. Compiler Optimization Techniques
2.15. Synthesis Language Support
2.16. Synthesis Settings Reference
2.17. Fitter Settings Reference
2.18. Design Compilation Revision History
2.6.3.1. Registering the SDC-on-RTL SDC File
2.6.3.2. Applying the SDC-on-RTL Constraints
2.6.3.3. Inspecting SDC-on-RTL Constraints
2.6.3.4. Creating Constraints in SDC-on-RTL SDC Files
2.6.3.5. Using Entity-Based SDC-on-RTL Constraints
2.6.3.6. Types of SDC Files Used in the Intel® Quartus® Prime Software
2.6.3.7. Example: Using SDC-on-RTL Features
2.12.1. Exporting a Version-Compatible Compilation Database
2.12.2. Importing a Version-Compatible Compilation Database
2.12.3. Creating a Design Partition
2.12.4. Exporting a Design Partition
2.12.5. Reusing a Design Partition
2.12.6. Viewing Quartus Database File Information
2.12.7. Clearing Compilation Results
3.1. Factors Affecting Compilation Results
3.2. Strategies to Reduce the Overall Compilation Time
3.3. Reducing Synthesis Time and Synthesis Netlist Optimization Time
3.4. Reducing Placement Time
3.5. Reducing Routing Time
3.6. Reducing Static Timing Analysis Time
3.7. Setting Process Priority
3.8. Reducing Compilation Time Revision History
Visible to Intel only — GUID: mwh1409958317398
Ixiasoft
2.12.7. Clearing Compilation Results
You can clean the project database if you want to remove prior compilation results for all project revisions or for specific revisions. For example, you must clear previous compilation results before importing a version-compatible database to an existing project.
- Click Project > Clean Project.
- Select All revisions to clear the databases for all revisions of the current project, or specify a Revision name to clear only the revision’s database you specify.
- Click OK. A message indicates when the database is clean.
Figure 129. Clean Project Dialog Box Cleans the Project Database