AN 1016: Timing Closure Methodology Quick Reference Guide
ID
836192
Date
11/15/2024
Public
Answers to Top FAQs
1. About This Application Note
2. RTL Analysis and Optimization Techniques
3. Post-Fit Analysis and Optimization Techniques
4. Additional Optimization Techniques
5. Iterative Analysis and Optimization
6. Document Revision History of AN 1016: Timing Closure Methodology Quick Reference Guide
3.2.3. Analyze Fitter Reports
Analyzing Fitter reports is necessary to ensure the design meets its timing and performance targets. These Fitter reports offer valuable insights into the physical implementation, resource optimization, and potential bottlenecks. By reviewing these reports, you can identify and address issues, resulting in a more reliable and efficient design. The following are some of the relevant Fitter reports for analysis.