A newer version of this document is available. Customers should click here to go to the newest version.
2.1. Installing and Licensing Intel® FPGA IP Cores
2.2. IP Catalog and Parameter Editor
2.3. Specifying the IP Core Parameters and Options
2.4. Simulating Intel® FPGA IP Cores
2.5. Simulating the Turbo IP with the RTL Simulator
2.6. Simulating the Turbo IP with the C-Model
2.7. Simulating the Turbo IP with MATLAB
4.2.2. CRC24A or CRC24B Early Termination
Early termination reduces power consumption and the overall latency, and increases the throughput significantly. It may also increase BER performance of the decoder.
The IP core checks the CRC checksum that the decoder generates after every iteration. Turbo decoding stops as soon as the CRC is successful. turbo decoding does not continue until the maximum number of iterations specified at the input ports. The gains depend on the signal-to-noise ration (SNR) of the received data block, block size, and the maximum number of iterations you specify.