Device Migration Guidelines: Agilex™ 3 FPGAs and SoCs C-Series

ID 848793
Date 8/07/2025
Public

3.8.1. Power Rails for Migration

During Agilex™ 3 device migration, ensure that power rail connections adhere to the required guidelines.

To ensure a smooth migration, prioritize understanding the key differences between the targeted package and the original package. Focus on reviewing the following areas:

Area Notes
HPS Some packages do not offer HPS. For migration of HPS to non-HPS and vice versa, the power rails connection will be different. Refer to the HPS section for the power rails connection guide.
I/O Migration of HSIO and HVIO is possible within all packages as they have the same number of HSIO and HVIO count respectively. Refer to the I/O section for the power rails connection guide.
Transceiver Migration of XCVR is possible within all packages as they have the same number of transceiver count. Refer to the Pin Connection Guidelines: Agilex™ 3 FPGAs and SoCs for more information.