GTS Transceiver PHY User Guide: Agilex™ 5 FPGAs and SoCs

ID 817660
Date 8/04/2025
Public
Document Table of Contents

3.10.1. Bonding Placement Requirements

For the Agilex™ 5 bonding implementation, you must follow the channel placement guidelines shown in the following figure for the channels in the bonded groups (x2, x4, x6, and x8 ). In the figure, CH0-CH7 are the logical channel number of the various bonded groups.
Figure 63. Bonding Channel Placement Requirement Guidelines