AN 761: Board Management Controller

ID 683850
Date 6/29/2022
Public

Running the Design Example

To run the design example, follow these steps:

  1. Connect all the required hardware. For more information, refer to the Hardware Setup Instruction section.
  2. Download and install the Board Management Controller design example from the design store. For more information, refer to the Importing Design Template section.
  3. Program the Intel® MAX® 10 device on the Development Kit with bmc.pof located in the project folder.
  4. Open Tera Term or BoardControl.tcl to send command to the Nios® II processor. For more information, refer to the Other Software section.