AN 1006: Multi-Project Analysis with Exploration Dashboard
ID
816589
Date
11/18/2024
Public
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
3.1. Using Exploration Dashboard in Offline Mode
The following steps describe how to generate mini Exploration Dashboard databases during Quartus compilation, and then import and merge them in the Exploration Dashboard window to analyze the compilation results.