AN 1006: Multi-Project Analysis with Exploration Dashboard
ID
816589
Date
11/18/2024
Public
A newer version of this document is available. Customers should click here to go to the newest version.
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
4.5. Report Design Assistant (Sign-off)
The Report Design Assistant (Signoff) command imports the Design Assistant reports generated at the Timing Analysis (Signoff) stage of each project's compilation. This import allows you to view each Design Assistant rule description, recommendations, and violations in a unified interface for easy aggregation of the reports.
Each design rule check (DRC) has a row that includes the following analyzed results:
- Total Violations—the total number of violations of the DRC summed across all projects in the analyzed group.
- Min Violations—the minimum number of violations of this DRC observed in a single project in the analyzed group.
- Max Violations—the maximum number of violations of this DRC observed in a single project in the analyzed group.
Figure 52. Design Assistant Summary
Figure 53. Detailed Design Assistant Reports