Quartus® Prime Pro Edition User Guide: Design Optimization
A newer version of this document is available. Customers should click here to go to the newest version.
Visible to Intel only — GUID: kan1587491377716
Ixiasoft
Visible to Intel only — GUID: kan1587491377716
Ixiasoft
7.6. Interactive ECO Fitting
In an interactive context, the ECO Fitter legalizes the changes, when appropriate. For example, for make_connection changes immediately after node creation, the Fitter does not attempt to route the connections immediately; rather, the Fitter waits until after the placement of the node prior to routing.