Quartus® Prime Pro Edition User Guide: Partial Reconfiguration

ID 683834
Date 5/16/2025
Public

Visible to Intel only — GUID: tcw1639671195905

Ixiasoft

Document Table of Contents

2.4.3. Partial Reconfiguration External Controller IP Timing Specifications

Timing Specifications: Partial Reconfiguration External Controller IP illustrates a successful PR operation with the Partial Reconfiguration External Controller IP. The PR operation initiates upon assertion of the pr_request signal. The avst_ready output signal indicates whether the SDM is ready to accept data from an external host.

Figure 67. Timing Specifications: Partial Reconfiguration External Controller IP