A preview is not available for this record, please engage by choosing from the available options ‘download’ or ‘view’ to engage with the material
Description
WW29, 2024: Metadata modified. No change in content.
Goal is to define a standards-based, open, interoperable, and secure architecture for secondary substations that addresses both the technical and business challenges faced by utilities. Validate architecture, business case and revenue models, and generate specifications for Hardware, Software and Applications.