ID:19254 Find <number> master CGB(s) for PMA or PMA/PCS bonding channel: <name>

CAUSE: The physical coding sublayer (PCS) bonding channels has zero or multiple master CGB(s) connected at the bonding clock ports.

ACTION: Create phase-locked loop (PLL) instances with master CGB in bonding mode and connect the bonding clock output ports of the master CGB to bonding clock input ports of the PCS bonding channels.