ID:171062 ECO Fitter applying ECOs to previous post-fitting netlists

CAUSE: You directed the Fitter to check and save all netlist changes to verify the design netlist after making ECO changes to the design. As a result, the Fitter is attempting to incrementally place and route the design changes in the ECOs.

ACTION: No action is required.