ID:188018 Placement has finished and a timing estimate of the critical path is provided below. This timing may differ from the final timing sign-off values.

CAUSE: Placement attempts to estimate the timing for the most critical path in the design. However, since routing has not yet been performed, this timing is an estimate and will differ from the true final timing values after a post fitter timing analysis.

ACTION: No action is required.