Early Place Stage Reports
		 During early place the Fitter begins assigning core design logic to device
			resources and provides preliminary timing closure feedback. Early place stage results
			are within 20% of final routed results. After this stage, evaluate whether your design
			likely meets timing before full routing.
	
		Figure: Early Place Stage Reports