ID:265070 Evaluation period of megafunction that supports OpenCore Plus feature can be prolonged to <time> by using tethered operation

CAUSE: Your project contains at least one megafunction that supports the OpenCore Plus feature. The evaluation period can be extended to the specified period of time by using tethered operation, which involves running the Programmer, programming the device via JTAG, and maintaining the JTAG connection for the duration of the evaluation period.

ACTION: Evaluate the megafunction that support the OpenCore Plus feature within the specified time period while running the Programmer.