List of Messages |
CAUSE: The netlist changes being applied do not require any placement or routing changes. As a result, the Fitter is skipping the those operations.
ACTION: No action is required.
Copyright© 2015 Altera Corporation. All rights reserved. ALTERA, ARRIA, CYCLONE, HARDCOPY, MAX, MEGACORE, NIOS, QUARTUS, STRATIX, and all other brands, unless noted otherwise, and/or trademarks of Altera Corporation in the U.S. and other countries.