|
Arizona Manufacturing Site
Dev, Fab, Assembly/Test
Chandler, AZ
Intel has had operations in Arizona since 1979. Operations in Arizona include the Wireless Communications and Computing Group, the Intel Communications Group, Corporate Materials and Services, Assembly and Test Development, Fab 12 and Fab 22.
Fab 22
Year Built:
Facility function:
Products:
Process technology:
Wafer size: |
|
2001
Fabrication
Logic products
0.13-micron process technology
200 mm |
| |
Fab 12
Year Built:
Facility function:
Products:
Process technology:
Wafer size: |
|
1996
Fabrication
Logic products
0.18-micron process technology
200 mm |
| |
ATD
Year Built:
Facility function:
Products:
Wafer size: |
|
1999
Assembly and test
Package development
N/A |
|