Columbia University, HP, Intel: Improves Research
Exponential Improvement in Center’s Computational Research with HP Servers
The 464-node “Titan” cluster at Columbia University uses HP BladeSystem to boost performance by 10x and reduce annual power costs by $95,000.
Objective
Deploy a single, large, general-purpose cluster while minimizing space, power, and cooling requirements.
Approach
Standardize on HP ProLiant* BladeSystem server blades, HP ProCurve* switches, and HP Integrated Lights-Out (iLO2)* for remote management.
IT improvements
• Hundreds of IT administrator hours saved on basic server management tasks
• 10x performance improvement over next-fastest system
• 15 to 20% performance improvement in jobs
• 100x faster server updates
• 50% reduction in administrator visits to physical clusters
• 40% reduction in power consumption
Business outcomes
• $95,000 USD annual savings in power and cooling costs
• $110,000 USD saved in rack and chiller costs compared to other vendor solutions
• Expense of two full-time hires avoided using HP iLO2
• Enhanced ability to attract and retain top researchers and projects
Read the full Columbia University, HP, Intel Case Study
477KB
申し訳ありませんが、この PDF はダウンロード形式でのみご提供しています。
Columbia University, HP, Intel: Improves Research
Exponential Improvement in Center’s Computational Research with HP Servers
The 464-node “Titan” cluster at Columbia University uses HP BladeSystem to boost performance by 10x and reduce annual power costs by $95,000.
Objective
Deploy a single, large, general-purpose cluster while minimizing space, power, and cooling requirements.
Approach
Standardize on HP ProLiant* BladeSystem server blades, HP ProCurve* switches, and HP Integrated Lights-Out (iLO2)* for remote management.
IT improvements
• Hundreds of IT administrator hours saved on basic server management tasks
• 10x performance improvement over next-fastest system
• 15 to 20% performance improvement in jobs
• 100x faster server updates
• 50% reduction in administrator visits to physical clusters
• 40% reduction in power consumption
Business outcomes
• $95,000 USD annual savings in power and cooling costs
• $110,000 USD saved in rack and chiller costs compared to other vendor solutions
• Expense of two full-time hires avoided using HP iLO2
• Enhanced ability to attract and retain top researchers and projects
Read the full Columbia University, HP, Intel Case Study


